Call +61 (0)411 145 553


Safescape Ladder
Laddertube is fully enclosed, preventing salt water and rocks from entering the escapeway.
Safe Escapeway Ladder Installation
Laddertube is a cost effective alternative to galvanised steel ladderways.
Safescape can install Laddertube for you or contact us to discuss training options.
mining ladderway
Laddertube is quickly being embraced by mine sites across Australia.
Underground mining ladder
The design of Laddertube ensures it is safe and practical for the user to climb.
 
Pause
  Search

Underground Mining Supplies

Laddertube is an innovative new ladder designed to be used in underground mines as an escapeway or travelway. It is designed to be installed in 1m diameter raisebored rises, however it can be installed in larger rises as well as blasted excavations.

The Safescape Laddertube product is essentially a series of ladder sections joined to provide a straight line of ladder of any practical length to be used in underground mines as escapeway ladders and stope access ladderways.

Safescape Laddertube is made from resilient plastics material and creates a fully enclosed tube which does not allow ingress of water, dirt and rock. The key benefits of Laddertube over steel caged ladderways are:

  • Lighter – at most half the weight of its lightest competitor.
  • Brighter – although Safescape Laddertube can be made in any colour, the stock offering will be safety yellow.
  • Safer – by its nature Safescape Laddertube will not allow water, dirt or small rocks into the travelway.
  • Longer lasting – as Safescape Laddertube is made from plastic, it will not rust and degrade over time.
  • Less maintenance – as salt water is not able to enter the ladderway regular de-scaling of salt buildup is not required.
  • Reduced raise size – the compact and strong nature of the product allows efficient use of space meaning Safescape Laddertube is the only product on the market which complies with AS1657 design rules and still fits in a 1m raisebore.
  • Faster delivery – Safescape Laddertube can be made at a rate of 50m per day from the day of order and can easily be upscaled compared to an average delivery time from order for a galvanized steel ladder in the order of 6 to 8 weeks. Enquire Now!
  • Reduced impact at installation – due to the reduced weight of Safescape Laddertube, the majority of installations can be achieved with two miners and a 4WD light vehicle with tray mounted crane. Compared to galvanized steel ladders which normally require a Crane and Integrated Tool Carrier for installation.
  • Ventilation savings - the sealed nature of Laddertube allows the system to be effectively sealed with the inclusion of a vent curtain on the doorway at the bottom access of the Laddertube and by sealing the annulus between the Laddertube and the borehole.  The potential savings in reduced requirement for ventilation walls or lost primary ventilation flow are huge.
© Copyright 2009 by Safescape, Bortana Pty Ltd